High Access Equipment
Mast Climbing Work Platforms (MCWP)
Mast Climbing Work Platforms are a convenient and cost effective means of high access which can be erected quicker than scaffold.
Our Capabilities:
- Single mast platforms up to 15.5m (1500kg payload capacity)*
- Twin mast platforms up to 30.8m (1500kg payload capacity)*
- Common mast platforms with maximum 18m between masts (1000kg payload capacity)*
*Depending on machine and configuration selected.
A typical mast climber configuration covering a façade of 20m length and 30m height could be installed in as little as 3 days. Due to their modular system, Rockcastle can design a mast climber configuration that suits your needs in the smallest possible footprint. Mast climber use on a site will also reduce the number of ties in a façade when compared to scaffold.
Mast Climbers can work up to twenty metres high free standing or travel up to 150 metres tied to a building. Rockcastle keeps stock of a vast range of mast climbers that are compliant with EN 1495 and installed as per BS 7981. Our mast climbers can be supplied with front or rear extended platforms to access tricky areas like balconies or façade fins meaning we will always find a solution for you.
Typically, on a façade of 40m length and 30m height, you might expect to find two twin mast platforms at 20m length with a capacity of 1500kg. This configuration could require 12 tie in points. Using the common tower system this could be reduced to 9 while still achieving the same coverage and capacity.
Rockcastle has the knowledge and facilities to create bespoke solutions to suits individual client needs.
For example, hoist located in lift shafts. Rockcastle has on multiple occasions, created specific platform sizes to suit many different lift shafts. We have also supported hoists over voids and against bridges where tie lengths reached up to 9m. Whatever the hurdle, Rockcastle will find a solution to overcome.
Benefits of using MCWP
Smaller footprint
With a smaller site footprint than scaffold we can set up in tighter spaces
Speedy erection and dismantle
Time taken to erect and dismantle full elevations can be reduced by as much as 85%
Modular builds
Reduced number of ties
Less tying in points allows more façade works to progress without interference.
Our Clients
At Rockcastle we pride ourselves on working with such titans of the construction industry. Dedication to finding the best solution for each challenge is a promise we make to ourselves and our valued clients.
Townsend St,
Dublin
City Quays 3, Belfast
SISK
Contractors
BAM Ireland
Townsend St,
Dublin
Dalmoy
Flynn
Ganson
graham
Keltbray
OPW